Mt. Juliet, TN 37122

Why Subbase Preparation Is Essential

The Base Under the Surface Decides How Long Your Pavement Lasts Subbase prep matters because the pavement is only as strong as the ground below it. If the base is weak, wet, soft, or uneven, the surface can crack, sink, and break apart much sooner. For parking lot...

Proper Curing Time for New Asphalt Lots

How Long New Asphalt Should Rest Before Normal Use For most new asphalt lots, light foot traffic is often fine within 24 hours, but car traffic usually needs at least 2 to 3 days. Heavy trucks may need a week or more. Full curing takes much longer, often 6 to 12...
Get Free Consultation